NEW GROUND FLOOR LOGISTIC CENTER AND OFFICE BUILDING WITH SUPPORT ACTIVITIES in the business park of Keratea with a total floor plan area of 10,800sq.m. The purpose of the project is the study, design, construction and erection of a new ground-floor building with gabled roofs as well as a three-story office building with composite slabs. In addition to the coverings of the buildings, the configuration of the architectural projections is also included, which ensure protection of the openings and an aesthetic effect in the office building.
CONSTRUCTION, ERECTION
COMPLETED
EUROHUB PHARMA LOGISTICS AE
2023
1.200 sq.m.
Learn moreThe project is the construction of part of the new bread production unit as an extension of the existing one in the facilities of the factory in Inofyta, Boeotia, with a total floor plan area of 5,900 sq.m. In addition to the main building, this includes the construction of an elevated external communication corridor with the existing factory, a steel extension to the loading ramps and the covering of an external staircase.