Construction of an egg collection, candling, sorting and packaging facility with a surface area of 2.220 sq.m in the Ioannina region. The building consists of one ground floor and one two storey section. The project involved the planning, supply and erection of the roof overlay, exterior side panelling and interior panelling, as well as internal configurations required for sanitation purposes.
DESIGN, CONSTRUCTION, ERECTION
COMPLETED
PTINOTROFIKI IOANNINON SA
KASIDIARIS IOANNINA
2016-2017
180 TN
Learn moreExtension of a new three-storey building with the provision of one extra floor. The new building is made of metal frames, which are formed by standard metal cross-sections. Vertical windbreaks are constructed in the transverse and longitudinal axes of the building, which receive the earthquake and the wind, stabilizing the construction, resulting in the building having the best possible seismic behavior. The metal columns extend 1.00m above the level of the roof of the 2nd floor so that in the future the new floor can be constructed. Side covers are included to support the siding as well as metal frames to create door and window openings in the metal frame where required. All metal surfaces of the columns, main floor beams and vertical windbreaks will be ironed and then painted.