Addition of two new production and storage buildings with a total area of 500 sq.m in Kymi, Evia. It included the configuration of an internal area in the storage building with floor plan dimensions measuring 4,23m x 11,85m. and a net height of 6.14m, as well as the addition of a suspended ceiling in two rooms in the old building.
CONSTRUCTION, ERECTION
COMPLETED
PANAYIOTOU BROS OE
KOTRONI, KYMI MUNICIPALITY
2014
45 TN
Learn moreAddition of a 500 sq.m extension to an existing meat processing plant in the VI.PA. area of Kifissia. The project included the planning, construction and installation of a metal building with a single hipped enclosed roof, as well as the remodelling of the facade of the existing building.