INFRASTRUCTURE CONSTRUCTION PROJECTS

DOORS OF ANEROBIC PROCESSING IN THE PREFECTURE OF ALEXANDROUPOLIS - MESOGEOS SA

Supply and installation of 12 doors in anaerobic digestion chambers in a municipal waste treatment unit in Alexandroupolis. The object of our work included the study, design, construction and installation in each chamber of a door that seals with compressed air including its frame as well as a smaller internal baffle.

TYPE

DESIGN, CONSTRUCTION, ERECTION

STATUS

COMPLETED

CLIENT

MESOGEOS SA

LOCATION

ALEXANDROUPOLIS URBAN WASTE PROCESSING UNIT

YEAR OF CONSTRUCTION

2020

QUANTITY

12 PCS

INFRASTRUCTURE CONSTRUCTION PROJECTS

DOORS OF ANEROBY PROCESSING IN THE PREFECTURE OF ILIA - AVAX SA / MESOGEOS SA

Supply and installation of 12 doors for anaerobic treatment chambers in a waste treatment unit of the Prefecture of Ilia. The object of our work included the study, design, construction and installation in each chamber of a door that seals with compressed air including its frame as well as a smaller internal baffle.

Learn more

LET'S TALK ABOUT YOUR NEEDS

CONTACT US