Metal platforms for a new production line with a total surface area of 3,150sq.m. within the existing Crown Beverage Europe facilities in Parma, Italy.
The project involved the planning, manufacture and delivery of all metal components that comprise the three metal platforms of the new production line, including their metal railings.
DESIGN, CONSTRUCTION
COMPLETED
ELEMKA S.A.
PARMA, ITALY
2018
350 TN
Learn moreSteel structures within inside an electrical power station fueled by combined cycle natural gas, with a total output of 192MW in Ghana.
The project included:
- Main Pipe Rack to support the steam turbine building, specifically a 2 level layout with a total surface area of ~ 300m2 and a total weight of 107Tn
- Auxiliary Pipe Rack to route piping of a total weight of 12 Tn
- Metal building structures:
Fire Fighting Pump Station (total floor area of ~ 285sq.m. and a total weight of 33 Tn} and
- Fuel Oil Treatment Plant Building (total floor area ~ 300sq.m. and total weight of 47 Tn)
- Metal railings and vertical stairs